Weekday trips start at 7:19am with the last trip at 1:45pm. Saturday trips start at 7:19am with the last trip at 1:54pm. Sunday trips start at 7:19am with the last trip at 1:56pm.
Destinations
Weekdays and Saturdays includes travel to Dubbo Station and Platform 1.
Weekdays and Saturday travel to Dubbo Station, Platform 1 starts at Central Station and Platform 5.
Sundays includes travel to Dubbo Station and Platform 1.
Sunday travel to Dubbo Station, Platform 1 starts at Central Station and Platform 6.
Holiday Schedules
Regular service that falls on a holiday is never completely dropped for dates within the current data publication.
Service is offered on the following holidays,
Labour Day
Christmas Eve
Christmas Day
Boxing Day
New Year's Eve
New Year's Day
Australia Day
Good Friday
Easter Saturday
Easter Sunday
Easter Monday
Anzac Day
Queen's Birthday
On the holidays above, trips start at 7:19am with the last trip at 1:45pm.
Select in Stop Times for more specific holiday information.
Note: Holidays are not necessarily observed and service may not be different from the usual for the day.
Real-Time stop predictions (Bus, Subway, Tram, Rail, and Ferry). Trip updates (Bus, Tram, Rail, and Ferry). NSW TrainLink Train Real-Time Service Alerts with system-wide, all lines, per line, and per stop options (All Travel Modes). Vehicle locations with per stop, per line, and per direction options (Bus, Subway, Tram, Rail, and Ferry). Transport for NSW on Facebook. TRANSPORT NEWS FEEDS with the system-wide option (Bus). TRANSPORT NEWS with the system-wide option (Subway, Tram, Rail, Cable Car, Ferry, Gondola, and Funicular).
Access from nearby service panels or a Line Web Page.
Bikes Policy
No info for any of the trips about bikes policy.
Accessibility Information
At least one wheelchair is accommodated on all trips. At least some vehicles can be boarded by a wheelchair user at any stop.
See the home page for additional agency service information.